4.13 Thermal Equipment and Pipe Insulation of the Whole Plant
4.13.1 Fiber felt and board laying of settings of membrane wall,superheater and cold ash hopper.
1 Scope:fiber felt and board laying of settings of membrane wall,superheater and cold ash hopper.
2 Quality criteria and inspection methods are shown in Table 4.13.1.
Table 4.13.1 fiber felt and board laying of settings of membrane wall,superheater and cold ash hopper
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_677.jpg?sign=1739308063-gEZ8M6w5vrezbe7pmgMobrnV8yITpT43-0-4f6f0bd58a6d1b68e50e59f5e70e16d3)
Table 4.13.1(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_678.jpg?sign=1739308063-QGhwHJwgNcXpCpAcamC9Z7JP195LcMv4-0-a510144f8c497c0db82cc0dd3e674923)
4.13.2 Main insulation wet masonry and outer wall trowel finish surface construction of thermal equipment.
1 Scope:construction of main insulation wet masonry and outer wall trowel finish surface of thermal equipment.
2 Quality criteria and inspection methods are shown in Table 4.13.2.
Table 4.13.2 Construction of main lnsulation wet masonry and outer wall trowel finish surface of thermal equipment
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_679.jpg?sign=1739308063-hCJIFBsi0h4YPfhzS3Qfp5JGucc4ehcC-0-a0de7b156d5e2b64fa11a32e0d6c00e5)
Table 4.13.2(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_680.jpg?sign=1739308063-zQAmzn1RjVAkJ4ZqZ6F9UUWemdYTZuKi-0-ca5825407c3236172715418f72f1043b)
4.13.3 Erection of main insulation masonry of thermal equipment and outer wall metal hood.
1 Scope:erection of main insulation masonry of thermal equipment and outer wall metal hood.
2 Quality criteria and inspection methods are shown in Table 4.13.3.
Table 4.13.3 Main insulation masonry of thermal equipment and erection of outer wall metal hood
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_681.jpg?sign=1739308063-JBK67Kw8uwZkw5KG0R1kObPS2al7Y5Cu-0-f6bd79f49825ba92fcf0277d3e889f9f)
Table 4.13.3(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_682.jpg?sign=1739308063-pyDQNc6NnEv4MtTtcBeUWNQbqESnayUw-0-d247e4d4044825e81297df779ea9040a)
4.13.4 Main insulation masonry(including air layer)of thermal equipment and erection of outer wall metal hood.
1 Scope:insulation of flue gas ducts,hot air ducts and cold air ducts.
2 Quality criteria and inspection methods are shown in Table 4.13.4.
Table 4.13.4 Main insulation masonry(including air layer)of thermal equipment and erection of outer wall metal hood
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_683.jpg?sign=1739308063-pkC2AfHl3BvuRXedOI93oSrjF60BFeiS-0-f42bf5a4484a77c85550e266dc03fc39)
Table 4.13.4(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_684.jpg?sign=1739308063-2KCYYOkjutrAdHI4ghwvu0PrrWe1NreM-0-5290983491c5f4a86721c5ce3b040050)
4.13.5 Construction of main insulation wet masonry of thermal pipes and outer wall trowel finish surfaces.
1 Scope:construction of main insulation wet masonry of thermal pipes and outer wall trowel finish surfaces.
2 Quality criteria and inspection methods are shown in Table 4.13.5.
Table 4.13.5 Construction of main insulation wet masonry of thermal pipes and outer wall trowel finish surfaces
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_685.jpg?sign=1739308063-pmGlqz4ltK1bnoWMNXD4eKMxk0GhHYdH-0-b36988edd0622c3c4d9a7e16d2dd6a84)
Table 4.13.5(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_686.jpg?sign=1739308063-yJ5IFTXYnwMyFTRYWLrlC6g5NhorJ29e-0-3f80863862f52c5e13edf38e5570cecd)
4.13.6 Main insulation masonry of thermal pipes and erection of outer wall metal hoods.
1 Scope:main insulation masonry of thermal pipes and erection of outer wall metal hoods.
2 Quality criteria and inspection methods are shown in Table 4.13.6.
Table 4.13.6 Main lnsulation masonry of thermal pipes and erection of outer wall metal hoods
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_687.jpg?sign=1739308063-JMlJuBrQ0FXbiygndRUxFBlGqkryRo8Y-0-b01400934ce88108b5607f47b97c33d1)
Table 4.13.6(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_688.jpg?sign=1739308063-avi6q0mGYzKpJftmqKHgCpjqIR9Nm2qW-0-ab272d2d294c62c0f2fdb756900e7e23)
4.13.7 Main insulation masonry of thermal main feed water,main steam,reheating steam pipes and erection of outer wall metal hoods.
1 Scope:main steam pipes,feed water pipe and reheating steam pipes.
2 Quality criteria and inspection methods are shown in Table 4.13.7.
Table 4.13.7 Main insulation masonry of thermal main feed water,main steam,reheating steam pipes and erection of outer wall metal hoods
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_689.jpg?sign=1739308063-b9luD3Azlue5g4sUzv6OUgPeNeGAT5eK-0-b8af4f56b2b3471ff8ce9b323665a4ab)
Table 4.13.7(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_690.jpg?sign=1739308063-Ls6w5HdLGOuhycWS8mGAqaOX584dpkn9-0-6d56102f4928c528aa046a23096306ea)
Table 4.13.7(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_691.jpg?sign=1739308063-InvFNxIUN6eaW57cQXgg5xTzYI4YGiC5-0-804adfa60559bce876f36c05c2e4e183)
Note:a—erection of a metal cover at any creep expansion measuring point shall be only applicable for main steam pipe and reheating steam heating section.
4.13.8 Steam turbine proper spraying and insulation.
1 Scope:steam turbine proper spraying and insulation.
2 Quality criteria and inspection methods are shown in Table 4.13.8.
Table 4.13.8 Steam turbine proper spraying and insulation
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_692.jpg?sign=1739308063-RauCL9Pxn6txGxUD4IxdYGXqnzNryN6a-0-7c488d36d5183c285c59485a430c7cca)
Table 4.13.8(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_693.jpg?sign=1739308063-HiYuu9fugkJuHHYdLux9nPJa8Xfc8Egc-0-f19d8c78259a2c90a03009663aa62e35)
4.13.9 Aluminum silicate fiber felt pasting lnsulation of steam turbine proper.
1 Scope:aluminum silicate fiber felt pasting insulation of steam turbine proper.
2 Quality criteria and inspection methods are shown in Table 4.13.9.
Table 4.13.9 Aluminum silicate fiber felt pasting lnsulation of steam turbine proper
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_694.jpg?sign=1739308063-gx09UHEn5whSMYAnrPenYFR4xTifDIMy-0-b188e5c08010a442e8a7a21e8f522727)
4.13.10 Mineral fine fiber felt and board insulation of steam turbine proper.
1 Scope:mineral fine fiber felt and board insulation of steam turbine proper.
2 Quality criteria and inspection methods are shown in Table 4.13.10.
Table 4.13.10 Mineral fine fiber felt and board Insulation of steam turbine proper
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_695.jpg?sign=1739308063-zK3hna9DvaY5vkWKMgjzRqhtE8KiNz4v-0-c3070ee79f99ab80d785406acd572c13)
4.13.11 Insulation mixtures priming,hard insulation board masonry and trowel finish coat construction of steam turbine proper cylinder contact surface.
1 Scope:insulation mixtures priming,hard insulation board masonry and trowel finish coat construction of steam turbine proper cylinder contact surface.
2 Quality criteria and inspection methods are shown in Table 4.13.11.
Table 4.13.11 Insulation mixtures priming,hard insulation board masonry and trowel finish coat construction of steam turbine proper cylinder contact surface
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_696.jpg?sign=1739308063-bMP9mgaNTbErk5w1c2o6a4RPMCde17uf-0-a594da428ab126a32e54d4d5d07e0415)
Table 4.13.11(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_697.jpg?sign=1739308063-7xzDtCdh6iyhKx0BZKyjLFb50pixyyxJ-0-8fb695aca163a35a71e0d5bdc7668f00)
4.13.12 Insulation of aluminum silicate refractory fiber bands or ropes of small-diameter thermal pipes:
1 Scope:insulation of aluminum silicate refractory fiber bands or ropes of small-diameter thermal pipes.
2 Quality criteria and inspection methods are shown in Table 4.13.12.
Table 4.13.12 Insulation of aluminum silicate refractory fiber bands or ropes of small-diameter thermal pipes
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_698.jpg?sign=1739308063-X08ipBjPE8iMtyWS0TRkLiWFWMXZ1tj7-0-12f3ab7a71011aaaacfb2510669a1ecd)
4.13.13 FRP insulation sleeves of valves and flanges.
1 Scope:FRP insulation sleeves of valves and flanges.
2 Quality criteria and inspection methods are shown in Table 4.13.13.
Table 4.13.13 FRP insulation sleeves of valves and flanges
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_699.jpg?sign=1739308063-RDaQxkxCKo7wTQyJPvdXgXnotCQ7I9ZD-0-8b1f9f4b1b95cea67dca6da6bbc518e8)
4.13.14 Insulation construction of metal shells of thermal equipment,pipe valves and flanges.
1 Scope:insulation construction of metal shells of thermal equipment,pipe valves and flanges.
2 Quality criteria and inspection methods are shown in Table 4.13.14.
Table 4.13.14 Insulation construction of metal shells of thermal equipment,pipe valves and flanges
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_700.jpg?sign=1739308063-o0OwxTJMOB4wZI2HjDkKAgGeRSZxnroy-0-be8610d02d77e99040d7988e9628db77)
4.13.15 Certification of insulation material sampling and re-inspection.
1 Scope:insulation materials,insulation concrete materials and trowel finish surface materials.
2 The certification of insulation material sampling and re-inspection shall meet the requirements of Table 4.13.15.
Table 4.13.15 Certification of insulation material sampling and re-inspection
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_701.jpg?sign=1739308063-i8EljtxHmM977eA64OPJByvVNfDHDGIW-0-2d7798dd032bb65b9bd05b90827ff50e)
4.13.16 Measurement record of equipment and pipe surface temperature after insulation.
1 Scope:surface temperature measurement to boiler setting,furnace top setting,reheating steam pipes,main steam pipes and the feed water pipes after insulation.
2 The measurement record shall meet the requirements of Table 4.12.12.
4.13.17 Implementation inspection list of mandatory provisions.
1 Scope:implementation inspection of mandatory provisions on insulation subsection project of steam turbine equipment and pipes.
2 The implementation inspection of mandatory provisions shall meet the requirements of Table 4.13.17.
Table 4.13.17 Implementation inspection list of mandatory provisions
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_702.jpg?sign=1739308063-fmnbetkXXECMGGYZkWgpuCQzeIdo9jq9-0-8e3b6c85df9406f1c62c7726286d9528)
Note:contents in this Table may be added or deleted properly according to actual situations.