4.6 Installation of Control Panel(Console,Box and Cabinet)
4.6.1 Quantity for acceptance inspection.
1 Control panel(console,box and cabinet)installed in rows shall be inspected 100%.
2 Control panel(console,box and cabinet)installed separately shall be inspected 30% randomly.
3 Other installation items shall be inspected 20% randomly.
4.6.2 Installation of control panel.
1 Manufacture and installation inspection and acceptance of control panel(console,box and cabinet)and equipment base are detailed in Table 4.6.2-1.
Table 4.6.2-1 Manufacture and installation of control panel(console,box and cabinet)and equipment base
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_180.jpg?sign=1738983364-b2zjE1Xee33gE4KvCxTvsbG8rHjg0Xz6-0-9caba845dc9ff6cb9d3d48f680926828)
Table 4.6.2-1(Continued)
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_181.jpg?sign=1738983364-IllT8QNazOPAeJFBOd5t90wSy5y3LbGB-0-e9433b62ac2def8e962c5e9b9939affd)
2 Installation inspection and acceptance of control panel(console,box and cabinet)and in rows are detailed in Table 4.6.2-2.
Table 4.6.2-2 Installation of control panel(console,box and cabinet)in rows
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_182.jpg?sign=1738983364-TGNEEf3B3k0xGtt9nqJ48oCCmdIK48J9-0-933f072f741866fb3d60c32a0dc95b5e)
3 Installation inspection and acceptance of individual panel(console,box and cabinet)are detailed in Table 4.6.2-3.
Table 4.6.2-3 Installation of individual panel(console,box and cabinet)
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_183.jpg?sign=1738983364-A809Hs67xtSJ21ayKrbSyRkdTV9GC2ZD-0-0bff989dc43c04a97a0c117258b22c0a)
4 Installation inspection and acceptance of thermostat,protective box and connection box are detailed in Table 4.6.2-4.
Table 4.6.2-4 Installation of thermostat,protective box and connection box
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_184.jpg?sign=1738983364-Jv63sjR8RqZd6BZkO4PmtGViaLIG62HT-0-e5746f7da6204d50a5ff1d2475eccc64)
Table 4.6.2-4(Continued)
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_185.jpg?sign=1738983364-7dnRPUbt9NSz2bpwaQ8q4ztzKC6izrTU-0-7ea28c2f9379af582159c8cdf8124530)
4.6.3 Installation of instruments on panel.
1 Installation inspection and acceptance of instrument on panel are detailed in Table 4.6.3-1.
Table 4.6.3-1 Installation of instruments on panel
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_186.jpg?sign=1738983364-evcZvvfWFJTGFuLyn6mKxCrMfNYAaaCq-0-774991ae4ceab281a83d3c784a4f7e74)
2 Installation inspection and acceptance of distributed control system are detailed in Table 4.6.3-2.
Table 4.6.3-2 installation of distributed control system
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_187.jpg?sign=1738983364-kRbSKpkbrORlD9WaUr3bRFnfE9s3Bwlf-0-79f98ff58809aec5966a454fe82ce2c6)
3 Installation inspection and acceptance of digital display instrument are detailed in Table 4.6.3-3.
Table 4.6.3-3 Installation of digital display instrument
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_188.jpg?sign=1738983364-8cem3vBIDDCtIuYqi8dk7YtdtaNxhF2L-0-6b5d4660fb3ad02a88ba01b4fe3044eb)
4 Installation inspection and acceptance of recording instrument are detailed in Table 4.6.3-4.
Table 4.6.3-4 Installation of recording instrument
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_189.jpg?sign=1738983364-zNaeVD4j6uHothcJFeFicwnUoSs41MFF-0-99977c70a1ff1aa93509d6502ecbcaf1)
5 Inspection and acceptance of survey instrument are detailed in Table 4.6.3-5.
Table 4.6.3-5 Survey instrument
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_190.jpg?sign=1738983364-JanlNuKifXowPpl6lwqxpWZB9yx47nhk-0-d9d8efd9dbdc47ca8862627631b466e4)
6 Installation inspection and acceptance of flashing-signal alarm devices and large screen display are detailed in Table 4.6.3-6.
Table 4.6.3-6 Installation of flashing-signal alarm devices and large screen display
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_191.jpg?sign=1738983364-WeLsjHp3biUt9gOkAXKUqhl9mCRcSFVq-0-5258eb797510bce069edff99bab6cfe1)
7 Installation inspection and acceptance of the control system for PLC are detailed in Table 4.6.3-7.
Table 4.6.3-7 Installation of the control system for PLC
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_192.jpg?sign=1738983364-IjeoNnXQj3YyQf2rFInJdiSyHJy8OJ7M-0-560c1d9ff1bc7d81cd9bb8b1e206ccfd)