4.11 Steam—Water Centralized Sampling,Feedwater,Boiler water Treatment System
4.11.1 Installation of sampling rack.
1 Scope of application:steam-water sampling device.
2 Inspection quantity:check them item by item.
3 Quality standards and inspection methods are as shown in Table 4.11.1.
Table 4.11.1 Installation of sampling rack
![img](https://epubservercos.yuewen.com/0C4D76/18000634808204406/epubprivate/OEBPS/Images/txt004_243.jpg?sign=1738811264-c3cYhKfaohfQdHGZ9jNop1dc14HPWQXi-0-9f45bca41dceb65cc61c70ea7e8503af)
4.11.2 Inspection of the compulsory provision implementation of the steam-water centralized sampling,feedwater,boiler water treatment system shall conform to Table 4.11.2.
Table 4.11.2 Inspection table of compulsory provision implementation of the steam—water centralized sampling,feedwater,boiler water treatment system
![img](https://epubservercos.yuewen.com/0C4D76/18000634808204406/epubprivate/OEBPS/Images/txt004_244.jpg?sign=1738811264-tDPebZlYPGZflg4jpxVXMA2BSWIwlxRM-0-bacb6a68411a671f38449301a5fbf34d)
Table 4.11.2(Continued)
![img](https://epubservercos.yuewen.com/0C4D76/18000634808204406/epubprivate/OEBPS/Images/txt004_245.jpg?sign=1738811264-oyFnvVfIH5TSDyOw583T7i6VesYgHOqq-0-2075b1d5e18d82d3790247cb4d4a9069)